Portfolio - Dam Removal
Back to Portfolio
Dam Removal - Underwater Wire Sawing
 Before cutting
 Pullies guide the diamond wire to the bottom of the piers; approximately 14 feet below the surface of the water.
 One of three divers used on the project.
 Debris found and cut through the piers.
|